2. Screwdriver presses the valve spool and depressurize the system.
Filler valve
3. Unscrew the ring from the valve.
4. Squeeze the retainer with pliers and push the valve through the floor.
5. Block the front wheels, then jack up the rear of the vehicle and support it on axle stands.
6. Squeeze the ends of the bracket together and remove both pressure lines from the valve. Take out the valve.
Discharge pipeline
7. Block the front wheels, then jack up the rear of the vehicle and support it on axle stands.
8. Squeeze the ends of the bracket together and remove the pressure line from the damper rod and filler valve (photo).
9. Release the pressure line from the brackets on the bottom.
Installation
10. Installation is carried out in reverse order, but finally inflate the system with 8.0 Bar and check for leaks, then reduce the pressure to 0.8 Bar (photo).
Visitor comments