The engine must be disassembled in a clean room.
It is advisable to have suitable containers for storing small parts, this will help when assembling the engine.
Thoroughly clean all components, dry and prepare for inspection. It is best to blow out the internal channels with compressed air.
Prepare a complete set of gaskets when removing the engine, and install them all.
If possible, screw the nuts, bolts and washers into place, this will protect the threads from damage and will also be useful when assembling the engine.
Visitor comments