After drilling or punching holes in the body, their edges must be cleaned and painted. Chips generated during drilling must be removed. In particular, cover moldings near the drilling site, as getting between the molding and the varnish coating, the chips under the influence of atmospheric phenomena begin to rust and cause a violation of the integrity of the coating.
For all installation work related to wiring, for safety reasons, it is imperative to disconnect the battery ground cable. Cables that must be laid when installing additional equipment should, if possible, be routed along existing cable harnesses using existing clips and rubber rings.
Additionally, reinforce newly laid cables with electrical tape, plastic, cable tape, etc. to eliminate noise from the cable while driving. At the same time, make sure that the distance between the cable being laid and the wires to the brake light is at least 10 mm, and the new cable must be laid at a distance of at least 25 mm from the wires that are connected to the engine or other moving parts of the car.
When installing additional equipment, make sure that it does not overload the generator. If necessary, install a larger generator.
Visitor comments