Execution sequence
1. We prepare the car for work (see «Preparing the car for maintenance and repair»).
2. Drain the coolant (see «Coolant - replacement»).
3. Remove the timing belt (see «Timing belt - condition check, tension adjustment and replacement»).
4. Remove the timing belt tensioner (see «Timing Belt - Tensioner Replacement»).
5. Using a 5 mm Allen key, unscrew the coolant pump mounting bolts.
6. Remove the pump from the engine block and remove it.
7. Using a thin slotted screwdriver, remove the sealing ring of the coolant pump.
Warning! When assembling, be sure to install a new gasket!
8. We clean the surfaces of the engine block mating with the pump.
9. Install the parts in reverse order.
10. Fill in the coolant (see «Coolant - replacement»).
Visitor comments